Commit Graph

4 Commits

Author SHA1 Message Date
Peter Chanthamynavong
d371baf2ca feat(dates): add --due and --defer timestamp options with natural language parsing (#847)
* feat(dates): add due date schema and --due flag

- Add due_at and defer_until columns to issues table via migration 035
- Implement --due flag on create command with ISO date parsing
- Extend RPC protocol and daemon to pass DueAt from CLI to storage
- Display DueAt and DeferUntil in show command output
- Update Issue type with new date fields

Users can now set due dates when creating issues, enabling deadline-based
task management.

* feat(dates): add compact duration parser (+6h, +1d, +2w)

- Create internal/timeparsing package with layered parser architecture
- Implement parseCompactDuration with regex pattern [+-]?\d+[hdwmy]
- Add comprehensive test suite (22 cases) for duration parsing
- Integrate into create.go with fallback to ISO format

Supports hours (h), days (d), weeks (w), months (m), and years (y).
Negative values allowed for past dates.

* feat(dates): add NLP parsing for natural language dates

Integrate olebedev/when library for natural language time expressions.
The layered parser now handles: compact duration → absolute formats → NLP.

Changes:
- Add olebedev/when dependency for NLP parsing
- Implement ParseNaturalLanguage and ParseRelativeTime functions
- Reorder layers: absolute formats before NLP to avoid misinterpretation
- Simplify create.go to use unified ParseRelativeTime
- Add comprehensive NLP test coverage (22 test cases)

Supports: tomorrow, next monday, in 3 days, 3 days ago

* feat(dates): add --defer flag to create/update/defer commands

Add time-based deferral support alongside existing status-based defer.
Issues can now be hidden from bd ready until a specific time.

Changes:
- Add --defer flag to bd create (sets defer_until on creation)
- Add --due and --defer flags to bd update (modify existing issues)
- Add --until flag to bd defer (combines status=deferred with defer_until)
- Add DueAt/DeferUntil fields to UpdateArgs in protocol.go

Supports: +1h, tomorrow, next monday, 2025-01-15

* feat(dates): add defer_until filtering to ready command

Add time-based deferral support to bd ready:

- Add --include-deferred flag to show issues with future defer_until
- Filter out issues where defer_until > now by default
- Update undefer to clear defer_until alongside status change
- Add IncludeDeferred to WorkFilter and RPC ReadyArgs

Part of GH#820: Relative Date Parsing (Phase 5)

* feat(dates): add polish and tests for relative date parsing

Add user-facing warnings when defer date is in the past to help catch
common mistakes. Expand help text with format examples and document
the olebedev/when September parsing quirk.

Tests:
- TestCreateSuite/WithDueAt, WithDeferUntil, WithBothDueAndDefer
- TestReadyWorkDeferUntil (ExcludesFutureDeferredByDefault, IncludeDeferredShowsAll)

Docs:
- CLAUDE.md quick reference updated with new flags
- Help text examples for --due, --defer on create/update

Closes: Phase 6 of beads-820-relative-dates spec

* feat(list): add time-based query filters for defer/due dates

Add --deferred, --defer-before, --defer-after, --due-before, --due-after,
and --overdue flags to bd list command. All date filters now support
relative time expressions (+6h, tomorrow, next monday) via the
timeparsing package.

Filters:
- --deferred: issues with defer_until set
- --defer-before/after: filter by defer_until date range
- --due-before/after: filter by due_at date range
- --overdue: due_at in past AND status != closed

Existing date filters (--created-after, etc.) now also support relative
time expressions through updated parseTimeFlag().

* build(nix): update vendorHash for olebedev/when dependency

The olebedev/when library was added for natural language date parsing
(GH#820). This changes go.sum, requiring an updated vendorHash in the
Nix flake configuration.
2026-01-01 20:06:13 -08:00
Steve Yegge
0b1a86a207 test: Refactor P1 test files to use shared DB pattern (bd-1rh)
Refactored 6 high-priority test files to reduce database initializations
and improve test suite performance:

- create_test.go: Combined 11 tests into TestCreateSuite (11 DBs → 1 DB)
- dep_test.go: Combined into TestDependencySuite (4 DBs → 1 DB)
- comments_test.go: Combined into TestCommentsSuite (2 DBs → 1 DB)
- list_test.go: Split into 2 suites to avoid data pollution (2 DBs → 2 DBs)
- ready_test.go: Combined into TestReadySuite (3 DBs → 1 DB)
- stale_test.go: Kept as individual functions due to data isolation needs

Added TEST_SUITE_AUDIT.md documenting the refactoring plan, results,
and key learnings for future test development.

Results:
- P1 tests now run in 0.43 seconds
- Estimated 10-20x speedup
- All tests passing

🤖 Generated with [Claude Code](https://claude.com/claude-code)

Co-Authored-By: Claude <noreply@anthropic.com>
2025-11-21 15:51:07 -05:00
Steve Yegge
cac9ae6647 Add routing integration tests and documentation
- Created routing_integration_test.go with comprehensive routing tests
- Tests cover maintainer/contributor detection, explicit overrides, end-to-end multi-repo
- Added docs/ROUTING.md documenting auto-routing feature
- Closed bd-6u6g, bd-zmi5, bd-nzt4, bd-btsm (routing tests)
- Updated bd-4ms and bd-8hf with progress notes

All routing tests pass. Multi-repo auto-routing is complete.

Amp-Thread-ID: https://ampcode.com/threads/T-2ea8b2ed-ceb7-432e-91f1-1f527b0e7b4d
Co-authored-by: Amp <amp@ampcode.com>
2025-11-04 23:12:42 -08:00
Steve Yegge
520af76234 Add comprehensive tests for create.go functionality
- Add 10 test cases covering basic creation, descriptions, design/acceptance
- Test labels, dependencies, discovered-from, explicit IDs, assignees
- Test all issue types and multiple dependencies
- All tests passing
- Maintains 27.6% coverage in cmd/bd

Amp-Thread-ID: https://ampcode.com/threads/T-2925a09a-b56d-4a2e-b79f-2d467c76feb2
Co-authored-by: Amp <amp@ampcode.com>
2025-10-31 21:51:54 -07:00