--- description: Orchestrate parallel bead processing with worktrees, PRs, and reviews --- # Parallel Beads Workflow This skill orchestrates parallel bead processing using subagents. Each bead gets its own worktree, implementation, PR, and review. ## Phase 1: Selection 1. **Get ready beads**: Run `bd ready` to list all beads with no blockers 2. **Filter by plan readiness**: For each ready bead, check if it's ready for batch implementation: - **Has plan** (`thoughts/beads-{id}/plan.md` exists): Include - **type=bug** without plan: Include (simple bugs can implement directly) - **type=feature/task** without plan: Exclude with warning ```bash # Check for plan existence ls thoughts/beads-{bead-id}/plan.md 2>/dev/null ``` 3. **Report skipped beads**: If any beads were skipped, inform the user: ``` Skipped beads (no plan): - {bead-id}: {title} (type: feature) - Run /beads_plan {bead-id} first - {bead-id}: {title} (type: task) - Run /beads_plan {bead-id} first ``` 4. **Present selection**: Use `AskUserQuestion` with `multiSelect: true` to let the user choose which beads to work on - Include bead ID and title for each option - Only show beads that passed the plan check - Allow selection of multiple beads Example: ``` AskUserQuestion with: - question: "Which beads do you want to work on in parallel?" - multiSelect: true - options from filtered bd ready output ``` ## Phase 2: Parallel Implementation For each selected bead, launch a subagent using the Task tool. All subagents should be launched in parallel (single message with multiple Task tool calls). ### Subagent Instructions Template Each implementation subagent should receive these instructions: ``` Work on bead [BEAD_ID]: [BEAD_TITLE] 1. **Create worktree**: - Branch name: `bead/[BEAD_ID]` - Worktree path: `~/wt/[REPO_NAME]/[BEAD_ID]` - Command: `git worktree add -b bead/[BEAD_ID] ~/wt/[REPO_NAME]/[BEAD_ID]` 2. **Review the bead requirements**: - Run `bd show [BEAD_ID]` to understand the acceptance criteria - Note any external issue references (GitHub issues, Linear tickets, etc.) 3. **Extract validation criteria**: - Check for a plan: `thoughts/beads-[BEAD_ID]/plan.md` - If plan exists: - Read the plan and find the "Automated Verification" section - Extract each verification command (lines starting with `- [ ]` followed by a command) - Example: `- [ ] Tests pass: \`make test\`` → extract `make test` - If no plan exists, use best-effort validation: - Check if `Makefile` exists → try `make test` and `make lint` - Check if `flake.nix` exists → try `nix flake check` - Check if `package.json` exists → try `npm test` - If none found, note "No validation criteria found" 4. **Implement the changes**: - Work in the worktree directory - Complete all acceptance criteria listed in the bead After implementation, run validation: - Execute each validation command from step 3 - Track results in this format: ``` VALIDATION_RESULTS: - make test: PASS - make lint: FAIL (exit code 1: src/foo.ts:23 - missing semicolon) - nix flake check: SKIP (command not found) ``` - If any validation fails: - Continue with PR creation (don't block) - Document failures in bead notes: `bd update [BEAD_ID] --notes="Validation failures: [list]"` 5. **Commit and push**: - Stage all changes: `git add -A` - Create a descriptive commit message - Push the branch: `git push -u origin bead/[BEAD_ID]` 6. **Create a PR**: - Detect hosting provider from origin URL: `git remote get-url origin` - If URL contains `github.com`, use `gh`; otherwise use `tea` (Gitea/Forgejo) - PR title: "[BEAD_ID] [BEAD_TITLE]" - PR body must include: - Reference to bead ID: "Implements bead: [BEAD_ID]" - Any external issue references from the bead (e.g., "Closes #123") - Summary of changes - For GitHub (`gh`): ```bash gh pr create --title "[BEAD_ID] [BEAD_TITLE]" --body "$(cat <<'EOF' ## Summary [Brief description of changes] ## Bead Reference Implements bead: [BEAD_ID] ## External Issues [Any linked issues from the bead] ## Changes - [List of changes made] ## Validation [Include validation results from step 4] | Check | Status | Details | |-------|--------|---------| | make test | PASS | | | make lint | FAIL | src/foo.ts:23 - missing semicolon | | nix flake check | SKIP | command not found | EOF )" ``` - For Gitea (`tea`): ```bash tea pr create --head bead/[BEAD_ID] --base main \ --title "[BEAD_ID] [BEAD_TITLE]" \ --description "## Summary [Brief description of changes] ## Bead Reference Implements bead: [BEAD_ID] ## External Issues [Any linked issues from the bead] ## Changes - [List of changes made] ## Validation [Include validation results from step 4] | Check | Status | Details | |-------|--------|---------| | make test | PASS | | | make lint | FAIL | src/foo.ts:23 - missing semicolon | | nix flake check | SKIP | command not found |" ``` 7. **Update bead status**: - Mark the bead as "in_review": `bd update [BEAD_ID] --status=in_review` - Add the PR URL to the bead notes: `bd update [BEAD_ID] --notes="$(bd show [BEAD_ID] --json | jq -r '.notes') PR: [PR_URL]"` 8. **Report results**: - Return: - PR URL - Bead ID - Implementation status (success/failure/blocked) - Validation summary: `X passed, Y failed, Z skipped` - List of any validation failures with details - If blocked or unable to complete, explain what's blocking progress - If validation failed, include the specific failures so the main agent can summarize them for the user ``` ### Launching Subagents Use `subagent_type: "general-purpose"` for implementation subagents. Launch all selected beads' subagents in a single message for parallel execution: ``` ``` Collect results from all subagents before proceeding. ## Phase 3: Parallel Review After all implementation subagents complete, launch review subagents for each PR. ### Review Subagent Instructions Template ``` Review PR for bead [BEAD_ID] 1. **Detect hosting provider**: Run `git remote get-url origin` - if it contains `github.com` use `gh`, otherwise use `tea` 2. **Read the PR**: - For GitHub: `gh pr view [PR_NUMBER] --json title,body,additions,deletions,files` - For Gitea: `tea pr view [PR_NUMBER]` - View the diff: `git diff main...bead/[BEAD_ID]` 3. **Review against acceptance criteria**: - Run `bd show [BEAD_ID]` to get the acceptance criteria - Verify each criterion is addressed 4. **Leave review comments**: - For GitHub: `gh pr review [PR_NUMBER] --comment --body "[COMMENTS]"` - For Gitea: `tea pr review [PR_NUMBER] --comment "[COMMENTS]"` - Include: - Acceptance criteria checklist (which are met, which might be missing) - Code quality observations - Suggestions for improvement 5. **Return summary**: - Overall assessment (ready to merge / needs changes) - Key findings ``` Launch all review subagents in parallel. ## Phase 4: Cleanup and Summary After reviews complete: 1. **Clean up worktrees**: ```bash git worktree remove ~/wt/[REPO_NAME]/[BEAD_ID] --force ``` Do this for each bead's worktree. 2. **Provide final summary**: Present a table or list with: - Bead ID - PR URL - Status (success / failed / blocked) - Validation summary (X/Y passed) - Review summary - Any failures or blockers encountered If any validation failures occurred, list them in a "Validation Failures" section so the user can address them. Example output: ``` ## Parallel Beads Summary | Bead | PR | Bead Status | Validation | Review | |------|-----|-------------|------------|--------| | beads-abc | #123 | in_review | 3/3 passed | Approved | | beads-xyz | #124 | in_review | 2/3 passed | Needs changes | | beads-123 | - | open (failed) | - | Blocked by missing dependency | ### Validation Failures - beads-xyz: `make lint` failed - src/foo.ts:23 missing semicolon ### Failures/Blockers - beads-123: Could not complete because [reason] ### Next Steps - Fix validation failures before merging - Review PRs that need changes - Address blockers for failed beads - Run `/reconcile_beads` after PRs are merged to close beads ``` ## Error Handling - **Subagent failures**: If a subagent fails or times out, note it in the summary but continue with other beads - **PR creation failures**: Report the error but continue with reviews of successful PRs - **Worktree conflicts**: If a worktree already exists, ask the user if they want to remove it or skip that bead ## Resource Limits - Consider limiting concurrent subagents to 3-5 to avoid overwhelming system resources - If user selects more beads than the limit, process them in batches ## Notes - This workflow integrates with the beads system (`bd` commands) - Worktrees are created in `~/wt/[REPO_NAME]/` by convention - Each bead gets its own isolated branch and worktree - PRs automatically reference the bead ID for traceability